Prosumer NET Metering Management System

Account Details

Bank: ZANACO

Account Name: ZESCO Limited – Capital Contribution

Account Type: Current Account

Account Number: 0005767502283

Branch: Lusaka Business Centre

Currency: ZMW

Upon successful application and site assessment, a quotation for the installation of the Net Meter will be issued. The following Connection Fees will be applicable depending on your Customer Category Class:

  • Single Phase Pre-Paid: ZMW 6,974
  • Three Phase Pre-Paid: ZMW 10,952
  • Maximum Demand Post-Paid: ZMW 41,255
  • Note that these fees are independent of the Administrative Fee.

    Download the Step by Step Guidelines

    ERB Approved Tariff

    SI THE ELECTRICITY (NET METERING) REGULATIONS

    Approved Photovoltaic

    Renewable Technical Specifications

    ZESCO Prosumer Application Form

    Logo

    APPLICATION GUIDELINES FOR NET METERING

    • Click the application link (Apply Now) and create a new application.
    • Have the following items handy:
      • You must be an existing customer
      • You must have A service or Meter Number
      • Attach Copy of NRC or Passport
      • Attach Certificate of Incorporation (if applying as a business)
      • TPIN
      • If Rented property at Tenancy Agreement
    • Landmark or GPS Coordinates of the property you wish to connect.
    • Ensure the installer is fully certified.
    • Ensure (a Non-Refundable) Administrative Fee of K1,738.00 is paid to the ZESCO Account provided on the left pane, Indicating the Meter No./Phone No. under the bank transfer reference. Proof of payment will be required to be uploaded during the application process.
    • Proceed to visit the nearest ZESCO Customer Service Centre for verification of the Proof of Payment.
    • Register or Login to proceed
    Sign Up Login